Reference list

drop List of main Water treatment Projects realized by Aliacem engineers

VaK Vinice, Kolín, Czech Republic 2005 Water treatment plant, equipment delivery, erection, SW and commissioning  
ČOV Zubří,
Czech republic
2005-2006 Water treatment plant, equipment delivery, erection, SW and commissioning  
ČOV Šumperk,
Czech republic
2005-2006 Water treatment plant, equipment delivery, erection, SW and commissioning  
ČOV Strachotín,
Czech republic
2006 Water treatment plant, equipment delivery, erection, SW and commissioning  
ČOV Mikulov,
Czech republic
2006 Water treatment plant, electrical detail design, SW  
ČOV Hustopeče,
Czech republic
2007 Water treatment plant, equipment delivery, erection, SW and commissioning  
ČOV Litovel,
Czech republic
2007 Water treatment plant, equipment delivery, erection, SW and commissioning  
Cement mill Water treatment plant, Lukavac,
Bosnia and Herzegovina
2008 Water treatment plant, equipment delivery, erection, SW and commissioning  
Kiln line and raw mill Water treatment plant, Lukavac,
Bosnia and Herzegovina
2009 Water treatment plant, equipment delivery, erection, SW and commissioning  

 

rays List of Actual References

PCLA Ladce a.s., CEMENT PLANT Slovakia 2008 Clinker cooler upgrade – fans, drives Detail design, Workshop drawings  
HOLCIM, Turňa, CEMENT PLANT Slovakia 2008 Material transport to Cemet mill #1 and Cement mill #2 - Mechanical and Electrical Detail design  
CEMMAC Horné Srnie, CEMENT PLANT Slovakia 2008 Kiln inlet gas analyzer, Cyclon IV analyzer, analyzer in down comer duct – 3 sets – TURN KEY Siemens – FLK, SW ALIS
HOLCIM, a.s., Turňa, CEMENT PLANT Slovakia 2008 Clinker transport - Mechanical and Electrical Detail design, WD  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Cement mill CM1 modification - Mechanical and Electrical Detail design  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Cement mill CM1- electrical turnkey project (design, delivery, erection , commissioning) Allen-Bradley, RS View , ABB
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Material transport- electrical turnkey project (design, delivery, erection, commissioning) Allen-Bradley, RS View , ABB
Lime plant Katowice, Poland 2008 Kiln line /Burning system – design, delivery, erection, start up SIMATIC S7 , WinnCC
JINDAL STEEL PLANT Bangalore, India 2008 Coal line /Burning systems – design, delivery, start up SIMATIC S7 , WinnCC
Dewan CEMENT PLANT line No.2, Pakistan 2008 Kiln line /Burning system - design, delivery, erection, start up SIMATIC S7 , WinnCC
CZMT a.s, CEMENT PLANT, Tajikistan 2008 Kiln line – Detail design  
SABA CEMENT, Yemen 2008 Cement plant – Tender documentation preparation, technical consultation  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Coal feeding to kiln burners - mechanical and electrical turnkey project (design, delivery, erection, commissioning) Allen-Bradley, RS View , Schenck, ABB
Coal Mill a.s. Coal grinding plant, Czech Republic 2008 Analyzers in coal mill system and in the coal dust silo – 3 sets – TURN KEY Siemens – SW ALIS
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Compressed air system - mechanical and electrical turnkey project (design, delivery, erection, commissioning)– TURN KEY Allen-Bradley, RS View , Boge
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008 Cooling water pumping station - mechanical and electrical turnkey project (design, delivery, erection, commissioning)– TURN KEY Allen-Bradley, RS View
Lime plant Vitošov, Czech Republic 2008 Extension of fuel base to coal storage and dosing - Detail design, supervison of erection, supervision of start up  
Lafarge Cement a.s., Čížkovice, Czech Republic 2008 Clinker storage and transport - Design for building permition  
PCLA Ladce a.s., CEMENT PLANT Slovakia 2008 Cement mill CM2 – raw material transport and feeding, dedusting of closed circuit Detail design, supervision of erection, supervision of commissioning  
Českomoravský cement, a.s., Mokrá, CEMENT PLANT Czech Republic 2008 Kiln line 2 – raw meal feeding, dedusting Detail design, supervision of erection, supervision of commissioning  
CEMMAC a.s., CEMENT PLANT Horné Srnie, Slovakia 2008 Kiln line – Calcining chamber Design for building permition  
Carmeuse Košice, Lime plant Slovakia 2008 Kiln line /Burning system - Fuel management system - design, delivery, erection, start up SIMATIC S7 , WinnCC
CoalMill a.s., COAL GRINDING PLANT Czech Republic 2008 Coal transport and coal dispatch - Electrical Detail design  
Carmeuse Mokra, Lime plant Czech republic 2008 Kiln line No 1 - user SW upgrade SIMATIC S7,CIMPLICITY
Carmeuse Mokra, Lime plant Czech republic 2008 Burning and fuel feeding system - Electrical Detail design and user SW SIMATIC S7,CIMPLICITY
Carmeuse Mokra, Lime plant Czech republic 2008 Burning system – control system delivery, erection, start up SIMATIC S7
Suez Cement , CEMENT PLANT Egypt 2008 Tertiary air duct system – Detail design, supervision of erection, delivery of TAD dampers  
JSF "Ivano-Frankivskcement", CEMENT PLANT Ukraine 2008 Kiln line /Burning system - design, delivery, erection, start up SIMATIC S7, WinnCC
YUG Cement, CEMENT PLANT Russia 2008 Kiln line /Burning system - design, delivery, erection, start up SIMATIC S7, WinnCC
CEMEX, CEMENT PLANT Mexico 2008 Kiln line /Burning system - design, delivery, erection, start up Schneider Quantum ,Magelis
CoalMill a.s., COAL GRINDING Czech Republic 2008 Coal transport and coal dispatch - delivery, electrical erection, start up  
CoalMill a.s., COAL GRINDING Czech Republic 2008 Coal Mill - delivery, erection SIMATIC S7,CIMPLICITY
CoalMill a.s., COAL GRINDING Czech Republic 2008 Coal transport and coal dispatch - commissioning and SW SIMATIC S7, CIMPLICITY
Autec spol. s.r.o., CEMENT PLANT Czech Republic 2008 Sampling equipment and pneumatic tube post for FCL Lukavac - Electrical detail design, electrical erection  
VOLYN Cement, CEMENT PLANT Ukraine 2008 Kiln line /Burning system for several fuel - delivery, electrical erection, start up SIMATIC S7 , WinnCC
PSP Technické služby a.s., Přerov, Czech Republic 2008 Gases distribution - Detail design  
CoalMill a.s., COAL GRINDING Czech Republic 2008 Engineering station  
ZVVZ Enven, Czech Republic 2008 Dedusting systems – electrical basic design  
PME s.r.o Czech Republic 2008 Gases distribution - Detail design  
CoalMill a.s., COAL GRINDING Czech Republic 2008 ESP system – delivery, erection, start up  
Sibirski Cement, CEMENT PLANT Russia 2008 Kiln line /Burning system - delivery, erection, start up SIMATIC S7 , WinnCC
Gharb Thorbat, CEMENT PLANT Iran   Kiln line /Burning system - delivery, erection, start up SIMATIC S7 , WinnCC
CoalMill a.s., COAL GRINDING Czech Republic 2008 Drives with frequency convertors- detail desing, erection ,commissioning ABB
Precheza a.s., Chemical plant Czech Republic 2008 Energy data collection – design, delivery, start up  
CoalMill a.s., COAL GRINDING Czech Republic 2008 Study of crushing process  
Hlinsko, Czech Republic 2008 EZS system -PZ  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008-2009 Raw material grinding – Detail design, user SW - TURN KEY Allen-Bradley, RS View
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2008-2009 New kiln line 2000 TPD - Detail design, workshop drawings, delivery, electrical erection, commissioning, user SW – TURN KEY Allen-Bradley, RS View
Herakles –Lafarge France, CEMENT PLANT Greece 2009 Kiln line /Burning system – design, delivery, erection, start up – TURN KEY 5 sets SIMATIC S7, WinnCC
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2009 Kiln inlet gas analyzer, Cyclon IV analyzer, analyzer in down comer duct – 3 sets – TURN KEY Siemens – FLK, SW ALIS
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2009 High temperature camera system Bass, SW ALIS
LCC, CEMENT PLANT Libya 2009 Kiln analyzers – 5 sets – design, delivery, erection, start up, trial run Siemens – FLK, ALIS
LCC, CEMENT PLANT Libya 2009 4 sets ITV High temperature camera system Bass ALIS
Štrkopiesky Hrubá Borša, Slovakia 2009 Gravel plant SIMATIC S7, RS View
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2009 Lighting and sockets for complete cement plant – design, delivery, erection, tests  
Českomoravský cement a.s., CEMENT PLANT Czech Republic 2009 Feeding system SM02D  
CoalMill a.s., COAL GRINDING Czech Republic 2009 Control system of powder coal feeding system ABB
CoalMill a.s., COAL GRINDING Czech Republic 2009 Compressor station – delivery, erection, start up  
Českomoravský cement a.s., CEMENT PLANT Czech Republic 2009 Compressor drive 6kV- erection, start up  
Carmeuse Mokra, Lime plant Czech republic 2009 Lime separation – delivery, electrical erection ABB
REKOS s.r.o, Slovakia 2009 Gravel plant  
Českomoravský cement a.s., CEMENT PLANT Czech Republic 2009 Mill fans 1300kW– electrical erection, start up  
CoalMill a.s., COAL GRINDING Czech Republic 2009 Dedusting of transport coal SIMATIC S7, CIMPLICITY
Českomoravský cement a.s., CEMENT PLANT Czech Republic 2009 Fuller pumps – electrical erection, start up  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2009 Limestone transport - Detail design, workshop drawings  
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2009 Tyres combustion - Detail design  
APV s.r.o, Brno, Czech republic 2009 Mixer station - electrical deliveries, electrical erection  
Českomoravský cement a.s., CEMENT PLANT Czech Republic 2009 Transport of bypass dust - erection  
CoalMill a.s., COAL GRINDING Czech Republic 2009 Coal sampling SIMATIC S7, CIMPLICITY
Autec spol. s.r.o., Czech Republic 2009 Sampling equipment and pneumatic tube post for FCL Lukavac - Visualization  
LCC, CEMENT PLANT Libya 2009 Cement mill lubrication systems including control system – 8 sets – design, delivery, mechanical and electrical erection, start up – TURN KEY Rexroth, Siemens
LCC, CEMENT PLANT Libya 2010 MV switchboards and cables for raw mill and kiln line – electrical design, delivery, electrical erection, start up, training – TURN KEY ABB
LCC, CEMENT PLANT Libya 2010 Clinker cooler drives upgrade HAWARI – 4 sets – mechanical and electrical deliveries – design, mechanical and electrical erection, start up (PIV change by gearbox drive&FC) Nord, ABB
FCL Lukavac, CEMENT PLANT Bosnia&Herzegovina 2010 Frequency convertors for big drives upto 2000kW - electrical design, delivery, erection, start up ABB
FVE Ceska Skalice, FOTOVOLTAIC PLANT Czech republic 2010 Outgoing system of electrical distributin to the net. ABB
Itaguassu cement plant Kiln line upgrade Brasil 2010 Kiln line capacity upgrade – new TAD, kiln hood, clinker cooler, fans.  
Českomoravský cement as, Mokrá Czech Republic 2010 Dust transport from EP, delivery, commissioning.  
Českomoravský cement as, Mokrá Czech Republic 2010 Dust transport from main filter, delivery, commissioning.  
LCC, CEMENT PLANT Libya 2010 Reclaimer upgrade El Fatahya - mechanical and electrical design, delivery, erection, start up – 2 sets Siemens
LCC, CEMENT PLANT Libya 2010 Reclaimer upgrade HAWARI - mechanical and electrical design, delivery, erection, start up – 2 sets Siemens
BRC S/A CEMENT PLANT Mato Grosso, Brasil 2010 Licence permition and Basic design for Greenfield plant, 2x3000TPD  
Carmeuse Mokra, Lime plant Czech republic 2010 Lime transport and dispatch – TURN KEY – design, civil/mechanical/electrical/delivery, mechanical/electrical erection, commissioning, start up  
FVE Choustnikovo Hradiste, FOTOVOLTAIC PLANT Czech republic 2010 Outgoing transformer system of electrical distributin to the net. ABB
Cement Hranice, Dyckerhof Czech Republic 2011 Burner systems upgrade, TURN KEY including certificates for natural gas operation. Siemens
LSR Cement, Cement plant 5000TPD St Petersburg, Russia 2011 Process and electrical commissioning of the complete FLS cement plant 5000TPD Allen Bradley
Cement Hranice, Dyckerhof Czech Republic 2011 Bypass system and clinker cooler upgrade  
Cement Hranice, Dyckerhof Czech Republic 2011 Water cooler for cement 100tph  
FCL Lukavac, CEMENT PLANT
Bosnia&Herzegovina
2011 Extension of cement transport and dispatch system  
HOLCIM Prachovice, CEMENT PLANT
Czech republic
2011 Upgrade of existing Haver&Boecker packing machine and paletizer lin  
CEMMAC Horné Srnie, CEMENT PLANT
Slovakia
2011 Upgrade of existing clinker cooler by new FONS DELTA shuttle floor cooler  
HOLCIM Prachovice, CEMENT PLANT
Czech republic
2011 Design and delivery of electrical part and SW for Ecorec waste fuel Project  
CARMEUSE lime plant, Mokrá
Czech Republic
2011 Upgrade of kiln burner systems (UNITHERM burner)